
FOB Price: $100 USD/SQM - 120 USD/SQM
MOQ: 100 SQM
Delivery Time: within 10 days
Supply Ability: 60000000 SQM/YEAR
Loading Port: Shenzhen Port
Payment Terms: T/T, L/C
Aluminium formwork is mainly used to solve the formwork construction of the cast-in-place main structure of housing construction. It can shorten the construction period and finished concrete structure does not need plastering. Construction with CIEZN aluminium formwork, the construction speed can reach 4 days per floor.

|  | Panel System Standard and irregular panels are used to guarantee the production of solid structured concrete. 
 | 
|  | Supporting System 
 Support system includes various types of posts/props catering to all kinds of roofs, beams, and cantilevered structures, to ensure panels on position solidly. | 
|  | Connection System Wedge and pins are used to ensure total integrity in interlocking panels. Flat ties are used to ensure wall thickness 
 | 
|  | Reinforcement System Square or rectangular hollow reinforcement waler to prevent over-loading and to guarantee dimensional accuracy. | 
Using CIEZN aluminum formwork, all structural building components can be cast in concrete in a single operation that dramatically reduces construction times and results in an extremely strong and high quality concrete structure.
The formwork is custom designed and made-to-measure for each project and is able to monolithically form all components at the same time including

Aluminium formwork application space is constantly increasing: such as small high-rise, medium and low-rise, basements, public buildings, complex structures, road auxiliary structures, pipe gallery projects, etc.

Construction with CIEZN aluminium formwork achieves with a high quality finish, finished concrete structure does not need plastering.


| Characteristics | Steel formwork | Plastic formwork | Timber formwork | Aluminum formwork | 
| Low dependence on equipment | 
 | √ | 
 | √ | 
| Form staircase with accurate dimensions for riser and thread | 
 | 
 | 
 | √ | 
| High strength & bearing capacity | √ | 
 | 
 | √ | 
| Suitable for high-rise buildings | 
 | 
 | 
 | √ | 
| Dismantle slab panels without moving props | 
 | 
 | 
 | √ | 
| Excellent concrete surface quality without plastering | √ | 
 | 
 | √ | 
| Easy to combine with other types of formwork | 
 | 
 | √ | √ | 
| Recycle utilization, less average cost | 
 | 
 | 
 | √ | 
| High speed of construction, save time cost | 
 | √ | 
 | √ | 
| Environment-friendly, no construction waste | √ | 
 | 
 | √ | 
| characteristics | Aluminum Frameworks | Timber Formworks | Difference | 
| Amotization | 3.73 | 14.4 | -10.67 | 
| Labour Cost | 20 | 25 | -5 | 
| Cost of Secondary Patching | No Secondary Patching | 16 | -16 | 
| Waste Disposal Fee | No waste | 2 | -2 | 
| Total | 23.73 | 57.4 | -33.67 | 
Unit: RMB/m²
Remarks:
Aluminum Formworks amotization: Divided by 300 after deducting the recycle value
Timber Formworks amotization: Divided by 10
The total price difference is about 4.5 USD/m²
Phone: +8618873103320
Email: aluform@ciezn.com
WhatsApp: +8618873103320
Address:11th floor, building 4, gaoshengxingguan office building, xiangfu road, yuhua district, Changsha, Hunan.